Our Facilities Department provides leadership and oversight for all district-owned buildings and grounds. This includes planning, maintenance, cleaning, upgrades, capital projects, and coordination of building use. 

Whitehall Central School District has two school buildings and a bus garage. The Junior-Senior High School was constructed in 1963 and serves students in grades 7-12. The Elementary School was built in 1968 and serves pre-kindergarten through grade 6. The buildings are well maintained through small, regular capital projects that have used the unreserved portion of the school district’s General Fund Balance. 

Contact Us:

Shane Armstrong
Director of Facilities 
518-499-1770 x2053

Capital Improvement Projects

  • On May 19, 2026, voters in the Whitehall Central School District approved the purchase of 7.32+/- acres of real property located at 270 Broadway, Whitehall, NY 12887 at a cost of $250,000 for the purpose of relocating the bus garage to that site. 

    The Board of Education and administration invited community volunteers to participate in monthly meetings with the Buildings and Grounds Committee to plan the transportation facility project. Interested residents submitted their names to serve as community representatives, and the following individuals were chosen by lottery on September 21, 2026, to make up the Transportation Committee:
    1. Mrs. Maryellen Ellis
    2. Mr. James Frasier
    3. Ms. Oshen Beayon
    Alternate: Mrs. Lynn Enny

  • 2018: $18M capital project: 
    Elementary School improvements: Gym floor, roof, boilers, entry way, parking lot and electronic entry system to enhance security
    High School Improvements: Gym floor, roof, boilers, electronic entry system, locker rooms
    District Wide Improvements: Football Field, track, septic system and drainage

    2013: $240,000 project
    Replace the roof over the pool and the roof over the cafeteria of the Jr-Sr High School

    2011: $625,000 project
    Replace the roof over the auditorium and renovate the interior

    2009: $525,000 project
    Renovate the high school gymnasium

    2007: $675,000 project
    Renovate the swimming pool

    2006: $1.2 million EXCEL capital project
    Replace the high school generator; install new phone, intercom and clock systems; repair sidewalks and curbs; and add new electronic doors to enhance security. At the same time, residents also approved a $100,000 capital project to renovate the bathroom and ventilation systems at the Elementary School.

     

Annual Notifications

  • Annual Fire Inspection
    The district conducts an annual fire inspection and submits a report to the New York State Eduction Department. Call 518-499-1772 to review a copy.
  • Asbestos Management Plan
    For more information, please contact Director of Facilities at 518-499-0330 ext. 2084
  • Pesticide Notification
    New York State Education Law Section 409-H, effective July 1, 2001, requires all public elementary and secondary schools to provide written notification to all persons in parental relation, faculty, and staff regarding the potential use of pesticides periodically throughout the school year. The Whitehall Central School District is required to maintain a list of persons in parental relation, faculty, and staff who wish to receive 48-hour prior written notification of certain pesticide applications. If you wish to be placed on this list, please contact the Director of Facilities, at (518) 499-0330 ext. 2084.

Water Testing Results

In accordance with the law, the district will conduct water testing at all buildings with the assistance of a state-approved laboratory. In accordance with the law, if the lead level from a water outlet exceeds the state’s action level of 15 parts per billion, the district will take immediate action. The state’s regulations require that all such outlets be taken offline, or otherwise restricted until a remediation plan is implemented, and further testing indicates that lead levels are below the action level.

Lead and Copper Results
US Environmental Protection Agency